EXPERIENCE Game Craft Series PUBLIC

Reconstruction Craft

The contractor bidding war — 15 complexes in the Gaon New Town and the fight for homeowner votes

The contractor for a redevelopment complex is not settled by a single bid. Construction firms court the association's members for months. In Reconstruction Craft you are the head of housing-business sales at a fictional construction firm. You face 7 rivals over the 15 complexes in the Gaon New Town, spending sales budget and action points to hit your order target. It is the third game in the Craft series.

Reconstruction Craft order screen: a 3D city map of the 15 Gaon New Town complexes, with industry news and tips

Reconstruction Craft order screen — control map of the 15 Gaon New Town complexes, turn 1/18. Captured 2026-11-14.

01 / INTRO

What this game is

For a construction firm, a redevelopment project can put trillions of won on the line at once. Yet there is no right answer on which complex to target, when, and how. Budgets are limited, construction capacity has its limits, and rivals are after the same complexes.

Reconstruction Craft turns this bidding war into a turn-based strategy game. First you pick one of 8 fictional construction firms, then set the contractor-selection schedule (plan) for the 15 complexes, your order target and the length of play. Each turn you spend action points (AP) and sales budget to court association members complex by complex. On the map, colors show whether each complex is in your favor, too close to call, or leaning to a rival.

Industry tips circulate too. Finding out which complex is hearing talk of a single bidder, or which firm put forward aggressive terms, costs action points and budget. Whether you spend first on information, money or time decides who wins.

The firms, complexes and people are all fictional. The game does not explain or predict any real redevelopment bidding war or any construction firm's strategy.

02 / FEATURES

How a game runs

Pick a firm

Choose one of 8 fictional firms — Taesung, Hangang, Daeryuk, Mirae, Jeongwoo, Sewon, Dongbang and Shinhwa — or get one at random. Each firm differs in construction capacity (4.2 to 7.2 trillion won), action points (AP 5–6), difficulty, sales budget, and its brand power, financial strength, cost competitiveness and financing-offer strength, and each has its own focus complexes.

Contractor-selection schedule

Pick one of three plans: the standard sequential spread plan (the classic, with the 15 complexes bidding evenly across the whole period), the early-concentration plan under the Shintonggihoek fast-track program (the choice complexes bunch up in the first half), or the landmark late-clash plan (mammoth complexes such as No. 5, 7, 10, 13 and 14 clash at the same time in the second half). You can unfold the schedule table for all 15 complexes.

Order target and length

Set a target of 3.5 trillion won (safe), 5.6 trillion (ambitious), 7.7 trillion (aggressive) or 10.5 trillion (reckless, with a risk of being fired if you fail), and play either the standard 18 months (18 turns) or the shortened 12 months (12 turns).

Order control map

View the 15 Gaon New Town complexes as a 3D city or a 2D tactical map. Colors distinguish your orders won, rival orders won, your lead, a toss-up, a rival lead, and bidding-war preparation. Rotate and zoom the camera with the mouse, and click a complex for details.

Order strategy room and the Gaon chat room

As sales head you manage the trust of the CEO and CFO (for example 75%), and check your order record (counted up to 5 complexes), sales budget, remaining construction capacity and expected net profit. You meet the complexes' residents and association members in the Gaon chat room. You can also see the order status and a detailed strength analysis of the 7 rival firms.

Industry news and tips

Rumors circulate every turn, such as a single bidder pushing a private contract or a rival's aggressive relocation-cost package. A tip check (1 AP, 400 million won) lets you separate truth from rumor and factor it into your strategy.

03 / SCREENS

Screen preview

Reconstruction Craft start screen: the bidding war over 15 Gaon New Town complexes, choose among 8 firms

Start — pick a firm, schedule and target

Reconstruction Craft order screen: 3D city map and industry tips

Orders — control map of the 15 complexes

Reconstruction Craft Data Lab and basis of calculations: a table of redevelopment-plan notice data for the 15 complexes

Data Lab — complex redevelopment-plan notice data

04 / DATA & METHODS

Rules and data

Firms
The construction capacity, action points (AP), sales budget and brand, finance, cost and financing ratings of the 8 fictional firms are fixed settings. For example, Taesung Construction has 7 trillion won in capacity, AP 5 and a sales budget of 33 billion won, while Hangang Construction has 7.2 trillion won in capacity.
Complexes and schedule
The 15 Gaon New Town complexes bid in sequence across the whole term (12 or 18 months) under one of 3 plans. Each complex has set figures for existing households, planned households (for example, Complex 1 goes from 1,882 to 3,500 households), expected construction cost (Complex 1: 2.35 trillion won) and base margin (Complex 1: 4.8%).
Resources
Action points (AP) limit how many actions you take each turn, sales budget goes to courting complexes and checking tips, and construction capacity caps the total you can win in orders. Your order record counts up to 5 complexes.
Data Lab and basis of calculations
Open the redevelopment Data Lab from the data-source menu at the top and you can see three things: the redevelopment-plan notice data for the 15 complexes (existing and planned households, expected construction cost, base margin and source for each), a benchmark of DART financial statements for the 8 firms, and the profitability engine and decision formulas. Complexes 1–14 are based on the 2026 redevelopment-plan notices for Seoul's Mokdong New Town Complexes 1–14 and public redevelopment data from Yangcheon-gu, while Complex 15 is stated to be a fictional complex designed to balance the underdog chances of securities-firm and large-contractor bidders. Inside the game, all are labeled Gaon Complexes 1–15 instead of district names.

The firm names, complex names and people are all fictional. However, the scale and construction costs of Complexes 1–14 were designed from real redevelopment-plan notices and public data, and the service states that only Complex 15 is fictional. See the service's data-source screen for the detailed formulas.

05 / LIMITS

Good to know

This game is a simplified simulation of a redevelopment bidding war. Real contractor selection involves far more variables, including association general meetings, the relevant laws, promotion rules and bid terms, and the game covers only some of them.

Firm names, complex names, executives and association members are all fictional. They have nothing to do with real construction firms or complexes and do not predict real bidding results.

The top of the service has menus for data sources and simulator validation. See those screens to check the basis for the rules.

06 / TECH STACK

Tech and how it was made

3D city map Turn-based strategy simulation Interactive web GitHub Pages AI-assisted production
07 / STATUS

Development status

PUBLIC

Anyone can play right away. Both the standard 18-month (18 turns) and shortened 12-month (12 turns) modes are supported.

08 / LINKS

Related links and materials

Explore other projects